We Solve Moisture Vapor and
Alkalinity Problems
VAP 1® 2000 and VAP 1® pH
 
   
   
     
   
VAP 1® 2000
PART 1 - GENERAL  
1.1 RELATED DOCUMENTS  
1.2 SUMMARY  
1.3 SUBMITTALS  
1.4 QUALITY ASSURANCE  
1.5 DELIVERY, STORAGE, AND HANDLING  
1.6 PROJECT/SITE CONDITIONS  
1.7 SCHEDULING  
PART 2 - PRODUCTS  
2.1 MANUFACTURERS  
2.2 MATERIALS  
2.3 KOESTER VAP 1® 2000 SYSTEM  
2.4 AREAS NOT REQUIRING VAPOR REDUCTION SYSTEM  
2.5 MIX DESIGNS  
PART 3 - EXECUTION  
3.1 EXAMINATION  
3.2 PREPARATION  
3.3 APPLICATION  
3.4 CLEANING  
3.5 PROTECTION  

PART 1 - GENERAL
   
1.1 RELATED DOCUMENTS
    A.  
   
Drawings, documents, and general provisions of the Contract, including, but not necessarily limited to, General Conditions and Division 1 Specification Sections, apply to this Section.
    B.  
      Related Sections - Coordinate work of this Section with work of other Sections to properly execute the work requirements and maintain satisfactory progress of work in other Sections.
       
      1. Section 03300: Cast-In Place Concrete installation and curing requirements according toACI302.
      2. Section 09620: Specialty Flooring, installation requirements.
      3. Section 09640: Wood Flooring, installation requirement.
      4. Section 09650: Resilient Flooring, rubber, sheet and vinyl tile installation requirements.
      5. Section 09660: Static Control Flooring, Installation requirements.
      6. Section 09670: Fluid Applied Flooring, Installation requirements.
      7. Section 09680: Carpet, installation requirements.
     
1.2 SUMMARY
    A.  
      This Section includes the furnishing, testing, and application of systems for the reduction of moisture vapor transmission and alkalinity control for Interior concrete slabs requiring the installation of VCT, vinyl flooring, rubber flooring, wood, carpet, and/or epoxy flooring systems.
     
1.3 SUBMITTALS
    A.  
      General: Submit each item in this Article according to the, requirements and Conditions of the Contract In Division 1., Specification Sections.
    B.  
      Product data for each type of product and process specified, which shall Include:
      1.. Manufacturer's Specification
2. Installation Instructions
3. Independent Test Data
4. Certification Requirements
5. Warranty Information
    C.  
      Submit anhydrous calcium chloride testing according to ASTM F 1869-98, that shall be performed by the Owner's Special Inspector to the Architect, Owner, General Contractor, and Water Vapor Reduction System Manufacture's Representative.
     
1.4 QUALITY ASSURANCE
    A.  
      Qualifications of Applicator
      1. Employ an Applicator currently approved by the manufacturer, experienced In surface preparation and application of the material and subject to inspection and control of the manufacturer.
      2. Installer shall have no less than five (5) years experience installing the Koester water vapor reduction coating systems.
    B.  
      Manufacturer's Qualification
      1. Manufacturer shall have no less than five (5) years experience in manufacturing the same water vapor reduction system. The water vapor reduction system must be specifically formulated and marketed Internationally for water vapor reduction and alkalinity control without change of formulation or system design for a minimum period of five (5) years.
      2. Manufacturer shall provide the Owner with their standard ten (10) year warranty at no additional cost. Applicator of water vapor reduction system shall provide standard installation warranty for workmanship.
      3. Manufacturer must provide Independent lab test reports documenting performance per the following:
          a. ASTM E 96, Water Vapor Transmission (dry and wet methods) Performance shall be documented by an independent testing laboratory at a minimum of 90% for Koester Vap1 2000 System, water vapor transmission reduction compared to untreated ACI Committee 201 durable concrete.
b. ASTM D 1308; Insensitivlty to alkaline environment up tp pH 14.
c. Certify acceptance to continuous topical water exposure after final cure.
      4. Submit list of product use and performance history, for the same formulation and system design, listing reference sources. Similar projects shall have documented minimum Initial water vapor transmission rates of 15 Ibs per 1,000 sf per 24 hrs, and have resulted in maintained water vapor reduction rate of less than 3 Ibs per 1,000 sf per 24 hrs when tested to ASTM F 1869-98.
     
1.5 DELIVERY, STORAGE, AND HANDLING
    A.  
      Deliver products to the job site in their original unopened containers, clearly labeled with the manufacturer's name and brand designation.
    B.  
      Store products in an approved ventilated dry area; protect from dampness, freezing, and direct sun light. Product should not be stored in areas with temperatures in excess of 90 °F or below 50 °F.
    C.  
      Handle product In a manner that will prevent breakage of containers and damage products.
     
1.6 PROJECT/SITE CONDITIONS
    A. Enviornmental Conditions:
      1. Do not apply moisture vapor reduction system to unprotected surfaces or when water is accumulated on the surface of the concrete.
2.
Do not apply water vapor reduction system when temperature is lower than 50° F or expected to fall below this temperature within 24 hours from time of application.
3.
Allow continuous ventilation and indirect air movement at all times during application and curing process of the water vapor reduction system.
    B.  
      Protection: Protect water vapor reduction system to prevent damage from active rain or topical water for a minimum period of 24 hours from time of appllcation.
     
1.7 SCHEDULING
    A.  
      Before installation of the receiving VCT, sheet vinyl, rubber flooring, wood, carpet, and or epoxy flooring systems over the interior concrete slabs, anhydrous calcium chloride testing shall be performed as per ASTM F 1869-98 by the Owner's Special Inspector as outlined In Article 3.1 below to determine the level of water vapor transmission In the slab and the type of moisture vapor reduction system required.
    B.  
      The Owner's Special Inspector will coordinate with the Owner scheduling water vapor reduction system testing and allowing enough time to test, submit and install the water vapor reduction system before installation of floor finish.
    C.  
      The Owner's Special Inspector will allow for as much time as Is reasonable for the concrete slab to dry before installing anhydrous calcium chloride tests. All mastics, glues, and/or contaminants shall be removed to provide a clean, sound, concrete substrate prior to installing anhydrous calcium chloride tests as per ASTM F 1869-98. No Exceptions!
PART 2 - PRODUCTS
   
2.1 MANUFACTURERS
    A.  
      Water vapor reduction system, which may be Incorporated In the work, shall be the product of a single manufacturer, no substitutions. Manufacturer's offering approved products such as:
      1. Koester VAP 1® 2000 System by Koester American Corporation; Corporate Headquarters: (757) 425-1206. Western Regional Office: (541) 548-0210
    B.  
      Terminology hereafter is based upon the products of Koester American Corporation.
 
2.2 MATERIALS
    A.  
      General: Use materials of one manufacturer throughout the project as hereinafter specified.
    B.  
      Water-based primer/curing agent, 100% solids VAP 1 ® 2000 coating, containing specifically formulated chemicals and resins to provide the following characteristics and properties.
      1. ASTM E 96, Water Vapor Transmission (dry and wet methods) Performance shall be documented by an independent testing laboratory at a minimum 90% for Koester VAP 1® 2000 System water vapor transmission reduction compared to untreated ACI Committee 201 durable concrete.
2.
Certify acceptance and exposure to continuous topical water exposure after final cure.
 
2.3 KOESTER VAP 1® 2000 SYSTEM
    A.  
      This one (1) coat system consists of one (1) coat of VAP 1 ® 2000 applied to a properly prepared concrete surface. Anhydrous calcium chloride testing performed by the Owner's Special Inspector having water vapor transmission levels greater then 3 lbs/24hrs. per 1000/sf. and less then 25 lbs/24 hrs per 1,000/sf. (depending on Individual conditions) shall determine where this system Is utilized and the coverage rates required. The Owner shall specify a floor covering system and adhesive having the ability to withstand water vapor transmission levels up to 3 Ibs/ 24 hrs per 1,000/sf. The water vapor reduction system shall be required to reduce vapor emissions by a minimum of 90% after final cure. Verify water vapor reduction by anhydrous calcium chloride testing according to ASTM F 1869-98 prior to proceeding with any floor covering Installation.
 
2.4 AREAS NOT REQUIRING VAPOR REDUCTION SYSTEM
    A.  
      Anhydrous calcium chloride testing performed by the Owner's Special Inspector for interior concrete slab areas receiving VCT, sheet vinyl, rubber flooring, wood, carpet, and or epoxy flooring systems will determine where these systems might be required. Water vapor reduction system might be required on concrete floors with water vapor transmission level less than 3 lbs/24 hrs per 1,000 sf or 5 Ibs for some specific flooring systems, verify with flooring system manufacturer.
    B.  
      Water vapor reduction system Is not required on Interior concrete slabs without floor finishes.
 
2.5 MIX DESIGNS
    A.  
      Use clean containers and mix thoroughly as per Manufacturer's requirements to obtain a homogeneous mixture. Use a low speed motor less than 400 rpm and a two btaded Jiffy mixing blade only. DO NOT AERATE. Mix ratios are measured by volume.
    B.  
      VAP 1® 2000 Mix Ratio: Mix Component A and Bat a ratio of 2.4:1.
PART 3 - EXECUTION
   
3.1 EXAMINATION
    A. Calcium chloride test requirements:
    1. Anhydrous calcium chloride testing shall be performed by the Owner's Special Inspector as outlined in Section 01410 - Quality Requirements.
2. Provide anhydrous calcium chloride tests according ASTM F 1869 - 98 In accordance to all surface preparation methods outlined. Tests shall be Installed onto freshly abraded contaminant free concrete. No exceptions
3. Only conduct calcium chloride tests at the same temperature and humidity expected during normal use. If this Is not possible, then the test conditions should be 75°F +-10°F and 50+-10% relative humidity. Maintain these conditions 48 hours prior to and during tests. Water vapor transmission levels are directly affected by ambient room temperature and readings conducted without a sustained ambient temperature are NOT acceptable.
4. Owner's Special Inspector shall provide test results with a marked up floor finish plan showing test results. Owner's Special Inspector shall provide a written clarification on status of the ambient air temperature and humidity before and during the testing procedures.
5. Owner's Special Inspector shall provide a marked up floor plan showing areas with vapor reduction system recommendations.
    B. Initial calcium chloride tests:
    1. Before installation of VCT, sheet vinyl, rubber flooring, wood, carpet, and / or epoxy flooring system over Interior concrete slabs, the Owner's Special Inspector shall make known the level of water vapor transmission In the slab In accordance to ASTM F 1869-98 to all parties involved. The Owner's Special Inspector will document the test results and provide recommendations on the type of moisture vapor reduction system to be utilized.
    C. Floor treatment calcium chloride tests:
    1. After proper cure of the final coat of the water vapor reduction system the Owner's Special Inspector shall provide calcium chloride tests to determine If the level of water vapor transmission and alkalinity are reduced to the Owner's specified levels In conjunction with the flooring manufacturers installation requirements. Contact Owner and water vapor reduction system Manufacturer's Representative concerning areas with a water vapor transmission level greater than the Owner's specified levels.
    D. Adhesion tests:
      1. The Owner's Special Inspector shall verify proper adhesion of flooring adhesives, coatings, and leveling compounds to the final vapor reduction coating system for acceptability. Contact Manufacturer's Representatives for recommendations.
3.2 PREPARATION
    A.  
    Inspect all surfaces with regard to their suitability to receive moisture vapor reduction system with vapor reduction coating system by Manufacturer's Representative.
    B.  
    Clean all surfaces to receive moisture vapor reduction system. Shotblast all floors and clean surfaces with Shop Vac to remove all residue off the substrate. Remove ALL defective materials, and foreign matter such as dust, adhesives, leveling compounds, paint, dirt, floor hardeners, bond breakers, oil, grease, curing agents, form release agents, efflorescence, laltance, Shotblast bee bees, etc. Repair all cracks, expansion joint, control Joints, and open surface honeycombs and fill in accordance with Manufacturers recommendations. Inform vapor reduction system manufacturer if concrete additives like chlorides or any other soluble compounds that can contaminate surfaces have been used in the concrete mix. Reinforcing fibers must be burned off, scraped and vacuumed. Remove, after shotblasting, leaving no fibers left on the concrete surfaces. Provide uncontamlnated, absorbtlve, sound surface. DO NOT ACID ETCH!
    C.  
      Repair concrete prior to moisture vapor reduction system installation by utilizing Koester SB Bonding Emulsion with approved concrete repair materials. Comply with all requirements as listed in Manufacturer's technical data information. No exceptions. Consult with vapor reduction manufacturer.
    D.  
    Make sure that surfaces to be treated with moisture vapor reduction system have NOT previously been treated with other materials like underlayments, screeds, penetrating sealants, etc. If this is the case, consult with the Manufacturers Representative prior to any application of moisture vapor reduction system.
    E.  
    Only a surface substrate that REMAINS uncontaminated, absorbtive, and sound is fit to receive a water vapor reduction system. Comply with all requirements as listed in Manufacturer's technical data information. No exceptions.
    F.  
    Proper removal of contaminants can render surfaces too rough for certain flooring systems. Therefore shotblast a small test area and verify with the flooring applicator that the surfaces are fit to receive the specified flooring system without the application of an underlayment on top of the VAP 1® 2000 System.
3.3 APPLICATION
    A. VAP 1® 2000 System Application:
      1. The coverage rates for this Single Coat system depend on the surface texture and porosity of the. substrate as well as the measured level of moisture, from Section 3.1 Examination. On average, coverage of 90 to 130 sq.ft./gal. can be expected.
2. Approximate Coverages Relative to Existing Levels of Moisture Vapor. Up to 8lbs./1000sq.ft./24hr. 130 sq.ft./gal. Up to 15 lbs./1000 sq.ft./24hr. 90 sq.ft./gal. Up to 25 lbs./1000 sq.ft./24hr. 70 sq.ft./gal.
3. Apply one coat of VAP 1 @ 2000 at an average coverage rate of 90 to 130 sq.ft./gal. using a squeegee and or a 3/8-inch nap roller leaving NO areas untreated. Allow to cure a minimum of 12 hours before installing flooring system. (See additional application instructions in Koester technical data sheets.)
    B.  
      Optional: VAP 1 Primer System Application; (For very porous surfaces to avoid out gasing /air displacement, see technical brochures.)
      1. Dampen uncontaminatedconcrete surface, (SSD) Surface Saturated Dry, leaving NO standing water. Surfaces must be damp, not wet to the touch. Always use clean potable water to pre-dampen concrete surfaces. Only pre-dampen concrete prior to the first VAP Primer coat. DO NOT pre-dampen between subsequent coats of the VAP Systems.
2. Spray VAP 1 Primer leaving no areas untreated. Back brush thoroughly.
3. Avoid puddling and pinholes when back brushing.
4. Provide continuous ventilation and air movement during curing process. No exceptions.
5. Apply first VAP 1 Primer coat at a rate of 250 sf per gallon and allow to cure a minimum of 6 hours. (See additional application instructions In Koester technical data sheets.)
6. Apply one coat of VAP 1 @ 2000 at an average coverage rate of 90 to 130 sf per gallon using a squeegee and or 3/8-inch nap roller leaving NO areas untreated. Allow to cure a minimum of 12 hours before installing flooring system. (See additional application instructions in Koester technical data sheets.)
    C.  
      A cementitious underlayment system with an approved epoxy primer if required by the Owner, Floor Covering Installer, or the Floor Covering Manufacturer may be used to level and smooth surfaces after shotblasting the floor on top of the water vapor reduction system. The underlayment system utilized must be tested and approved (no exceptions) by the manufacturer of the underlayment system prior to installation. No underlayment system containing gypsum will be allowed. When water based adheslves are utilized in the floor covering installation, use an approved underlavment system with primer prior to the Installation of the flooring system. Please consult the adhesive manufacturer for their minimum recommended thickness of cementitious underlavment to absorb excess moisture In the adhesive. Leveling of the substrate shall not be considered part of the water vapor reduction system. No exceptions.
    D.  
      For installation of resilient flooring directly over the water vapor reduction system, the contractor responsible for installing the floor covering system shall use 100% solids adheslves and or contact type adhesives with long working times that can be applied to substrates with a pH up to 10. The method of use is to apply the contact type adhesives to the substrate and allow the materials water to flash off prior to the flooring installation. Always test proper adhesion of adhesive to water vapor reduction system prior to Installation of entire flooring systems. No exceptions.
3.4 CLEANING
    A.  
      Clean all tools and equipment with xylene immediately after use for the VAP 1® 2000 System and water when using VAP 1 Primer for water vapor reduction.
    B.  
      water when using VAP 1 Primer for water vapor reduction. B. Remove all debris resulting from water vapor reduction system Installation from project site.
  3.5 PROTECTION
    A.  
      Protect each coat during specified cure period from any kind of traffic, topical water, and contaminants.
   
       
       
Email: info@koesterusa.com
Koester American Corp. • 2585 Aviator Drive • Virginia Beach, VA 23453 • Tel.(757) 425-1206 • FAX (757) 425-9951
Copyright 2004-05 Koester American. Web Page created by PC Technology
Website maintained by SLY Communications